RM

Command Center

Unified operating picture

Detect → Understand → Predict → Recommend → Approve → Execute → Verify → Learn. Every domain, one model.

AI opportunity value

$3.8M/yr

Production

-5.1

76,800BOPD

Target 81,000

Production Loss

+12.4

4,200BOPD

Top cause: ESP degradation

Asset Availability

-0.8

94.2%

Target 96.0%

Critical Equipment

+2

7assets

3 with open alarms

Open Work Orders

-6

184WOs

22 overdue

Inventory Risk

+3

12items

Below reorder point

HSE

+1

2high-risk

Observations last 7d

Procurement

-2

17awards

Pending approval

Field production — actual vs plan vs forecast

BOPD, rolling 7 days

-5.1% vs plan

Domain event stream

Event-driven agent triggers

  • WellProductionDropped

    W-143 · Operations Agent

    12 min ago
  • EquipmentAlarmRaised

    C-201 · Maintenance Agent

    38 min ago
  • InventoryBelowMinimum

    SP-BR-550 · Inventory Agent

    1 hr ago
  • IncidentReported

    INC-1187 · HSE Agent

    3 hrs ago
  • MaintenanceDue

    PL-07 · Maintenance Agent

    5 hrs ago
  • AFEOverBudget

    AFE-2291 · Finance Agent

    9 hrs ago

Fields

Field 360 — production, wells and availability

Operations
FieldTypeWellsOil (BOPD)Gas (MMscfd)Availability
Field AlphaOil Field8438,40062
93.1%
Field DeltaOil Field6124,10041
96.4%
Sira Gas FieldGas Field298,300310
91.2%
North TerraceOil Field226,00018
97.8%

Cross-domain workflow in flight

Compressor C-201 abnormal vibration

  1. Operations

    Reduced compressor performance detected

  2. AI

    Bearing failure predicted — 87% confidence

  3. Maintenance

    Work recommendation created (WO-24118)

  4. Inventory

    Bearing BR-550 stock check — 1 available, 1 reserved

  5. Procurement

    Urgent PR-5521 raised for 4 units

  6. HSE

    Hot work permit PTW-8842 requirements verified

  7. Planning

    Shutdown window 12–14 Sep identified

  8. Finance

    Cost impact $102K vs AFE-2291

  9. Management

    Awaiting approval

AI findings — critical

3

AI findings — high

11

Actions approved

28

42 recommended

Avoided downtime

126 hrs

Savings $1.84M

CRITICAL Maintenance AgentAI-3391

Bearing degradation predicted on Compressor C-201

C-201 · CPF Train 02

Confidence

87%

ImpactUnplanned shutdown risk ≈ $920K · 36 hrs deferment

Probable causes

  • Vibration 1x/2x harmonics rising over 21 days
  • Lube oil particle count above alarm
  • Load cycling above design envelope

Recommended actions

  • Schedule inspection within 7 days
  • Reserve bearing BR-550
  • Verify lubrication system
  • Combine task with planned shutdown window

Data analysed

  • 180 days of vibration history
  • 43 maintenance records
  • 16 comparable compressors
  • Current operating conditions
Governance: human approval required for safety-critical execution
HIGH Operations AgentAI-3388

Well W-143 production down 17% in 24 hours

W-143 · Field Alpha

Confidence

82%

ImpactDeferment 640 BOPD · $41K/day

Probable causes

  • Increasing water cut
  • ESP efficiency degradation
  • Choke restriction
  • Flow-line pressure increase

Recommended actions

  • Verify wellhead pressure
  • Inspect ESP telemetry
  • Schedule well test
  • Compare against W-139 and W-141

Data analysed

  • SCADA 24h trend
  • Last 6 well tests
  • ESP motor current signature
  • Offset well behaviour
Governance: human approval required for safety-critical execution

Command centre upload

Cross-domain daily KPI feed

Drop a CSV export here, or use Upload data

Expected columns: date, domain, production_boed, availability_pct, open_wos, hse_events, cost_usd

Files are parsed in your browser — nothing leaves this session.

Chat with this datano file uploaded

Ask questions about your command dataset — trends, outliers, cost drivers, next actions.