Monitors production, deferment and operating performance across fields.
Intelligence
AI control center
Not one chatbot — a fleet of domain agents subscribed to domain events, producing governed, approvable actions.
Critical findings
3
High findings
11
Medium findings
37
Actions approved
28
4 rejected
Estimated savings
$1.84M
Avoided downtime
126 hrs
Active domain agents
Predicts equipment failure from telemetry, history and work orders.
Bad-actor and failure-pattern analysis, drafts evidence-based RCAs.
Detects emerging safety risk from incidents, PTW and shift data.
Evaluates bids on technical, commercial, risk and local-content criteria.
Optimizes critical spares, reorder points and dead stock.
Predicts schedule slippage and procurement bottlenecks.
AFE overrun prediction and EBITDA contribution analysis.
Bearing degradation predicted on Compressor C-201
C-201 · CPF Train 02
Confidence
87%
ImpactUnplanned shutdown risk ≈ $920K · 36 hrs deferment
Probable causes
- Vibration 1x/2x harmonics rising over 21 days
- Lube oil particle count above alarm
- Load cycling above design envelope
Recommended actions
- Schedule inspection within 7 days
- Reserve bearing BR-550
- Verify lubrication system
- Combine task with planned shutdown window
Data analysed
- 180 days of vibration history
- 43 maintenance records
- 16 comparable compressors
- Current operating conditions
Well W-143 production down 17% in 24 hours
W-143 · Field Alpha
Confidence
82%
ImpactDeferment 640 BOPD · $41K/day
Probable causes
- Increasing water cut
- ESP efficiency degradation
- Choke restriction
- Flow-line pressure increase
Recommended actions
- Verify wellhead pressure
- Inspect ESP telemetry
- Schedule well test
- Compare against W-139 and W-141
Data analysed
- SCADA 24h trend
- Last 6 well tests
- ESP motor current signature
- Offset well behaviour
Emerging safety risk — 4 hydrocarbon leak observations in Area B
Area B · 21 days
Confidence
76%
ImpactPotential loss of containment · high consequence area
Probable causes
- Valve seal deterioration common to V34–V48
- Same seal material batch
- Elevated cycling frequency
Recommended actions
- Inspect valves V34–V48
- Increase gas monitoring frequency
- Review sealing specification
- Create inspection campaign
Data analysed
- 4 observation reports
- Valve maintenance history
- Gas detector trend
- Contractor shift logs
Projected stockout — ESP Controller PCB
SP-PCB-ESP · Field Alpha
Confidence
91%
Impact3 units short vs 90-day demand · 62-day lead time
Probable causes
- Demand forecast 5 units next 90 days
- On hand 2 units
- No approved alternative part
Recommended actions
- Create purchase requisition for 4 units
- Flag as critical spare
- Check consignment stock at vendor
Data analysed
- 24 months consumption
- ESP failure predictions
- Vendor lead-time history
Bad actor — Pump P-402 failed 3 times in 6 months
P-402 · Terminal East
Confidence
79%
ImpactRepair spend $28K · availability −1.4%
Probable causes
- Seal flush plan inadequate for service
- Repeated dry-run events on start-up
- Misalignment recorded twice
Recommended actions
- Open RCA with reliability engineer
- Revise API plan 11 to plan 32
- Add start-up interlock
- Laser alignment on next PM
Data analysed
- 3 work orders
- Technician notes
- Operating condition history
- Spare parts consumption
Recommended award — ABC Industrial (score 91/100)
PR-5518 · ESP Controller PCB
Confidence
88%
ImpactLifecycle saving $34K · 14 days faster
Probable causes
- Fully technically compliant
- Lowest lifecycle cost
- Best delivery among compliant bidders
Recommended actions
- Route to award approval
- Attach technical evaluation
- Request performance bond
Data analysed
- 3 vendor offers
- Technical evaluation sheet
- Vendor performance history
AI action engine
Insight → approval → execution
Operations
Reduced compressor performance detected
AI
Bearing failure predicted — 87% confidence
Maintenance
Work recommendation created (WO-24118)
Inventory
Bearing BR-550 stock check — 1 available, 1 reserved
Procurement
Urgent PR-5521 raised for 4 units
HSE
Hot work permit PTW-8842 requirements verified
Planning
Shutdown window 12–14 Sep identified
Finance
Cost impact $102K vs AFE-2291
Management
Awaiting approval
Governance
- Every recommendation carries confidence, data used, reasoning, evidence, impact and risk.
- Agents inherit the requester's ERP permissions — no privileged retrieval.
- Safety-critical or high-value actions cannot execute without the approval matrix.
- All approvals, rejections and outcomes feed the agent learning loop.
Records & transactions
Post a ai transaction — it flows to the linked departments, charts and AI analyst
No records posted yet. Add one and it will appear in the tables above, the Data Studio charts and the AI chat context.
AI signal upload
Model outputs, confidence and realised impact
Drop a CSV export here, or use Upload data
Expected columns: insight_id, agent, domain, date, confidence, impact_usd, accepted, hours_saved
Files are parsed in your browser — nothing leaves this session.
Ask questions about your ai dataset — trends, outliers, cost drivers, next actions.