RM

Manufacturing

Production operations & transformation

Feedstock → processing → separation → treatment → storage → product transfer, controlled as production orders with full batch genealogy.

OEE

78.4%

Availability

91.2%

Performance

89.6%

Quality

95.9%

Yield

93.1%

Scrap / Slop

2.4%

Manufacturing flow

Plan to finished goods

Production PlanMaterial RequirementsProduction OrderMaterial IssueManufacturingQuality InspectionFinished GoodsWarehouse

Plants, lines & work centers

Capacity, OEE and downtime

LinePlantRateCapacity usedOEEDowntime 7dStatus
LN-CDU1Crude Distillation Unit 1Refinery North42,000 bbl/d
88%
81%3.2 hNominal
LN-SEP2Separation Train 02CPF31,500 bbl/d
94%
74%9.6 hWatch
LN-TRT3Gas Treatment Unit 3CPF310 MMscf/d
76%
86%1.1 hNominal
LN-LPG1LPG FractionationRefinery North6,200 bbl/d
61%
69%14.4 hConstrained

Production orders

Planned vs actual, WIP and stage

OrderProductBatch / LotLinePlannedActualWIPStage
PO-8841Stabilized Crude — Grade AB-2291LN-CDU142,00039,8001,400Manufacturing
PO-8838Sales Gas — Spec 1B-2288LN-TRT33103060Quality Inspection
PO-8834LPG — Commercial PropaneB-2284LN-LPG16,2004,900820Manufacturing
PO-8829Condensate — ExportB-2279LN-SEP212,50012,5000Finished Goods

Bill of materials & routing

Stabilized Crude — Grade A (Batch B-2291)

Inputs

  • Wellhead crude — Field AlphaFeedstock38,400 bbl
  • Wellhead crude — Field DeltaFeedstock5,100 bbl
  • Demulsifier DX-40Chemical1,240 L
  • Corrosion inhibitor CI-19Chemical860 L
  • Process energyUtility412 MWh

Routing steps

  1. 1Reception & meteringWC-10 · 0.5 h
  2. 2Three-phase separationWC-21 · 2.0 h
  3. 3Desalting & treatmentWC-22 · 1.5 h
  4. 4StabilizationWC-30 · 3.0 h
  5. 5Storage transferWC-41 · 0.8 h

Downtime reason codes

Last 7 days — 28.3 hours total

Compressor trip (C-201)9.6 h · 34%
Feedstock shortfall6.2 h · 22%
Planned changeover5.1 h · 18%
Off-spec recycle4.3 h · 15%
Utility instability3.1 h · 11%

AI: the compressor trip on C-201 is the dominant bottleneck. Executing WO-24118 inside the September window recovers an estimated 9.6 h/week of availability and 2.1 pts of OEE on Train 02.

Manufacturing data upload

Production orders, yield and OEE inputs

Drop a CSV export here, or use Upload data

Expected columns: order_id, line, product, batch, date, planned_qty, produced_qty, scrap_qty, downtime_min

Files are parsed in your browser — nothing leaves this session.

Chat with this datano file uploaded

Ask questions about your manufacturing dataset — trends, outliers, cost drivers, next actions.