SAP mode
RM

Knowledge

Document control & company RAG

Revision control, transmittals and approval workflow — with retrieval that respects role-based permissions.

Controlled documents

41,208

Pending approval

26

Indexed for RAG

93%

Collections

9

Document Agent

Show the isolation procedure for Compressor C-201

Isolation of C-201 requires double block and bleed on the suction and discharge headers, nitrogen purge to <1% LEL, and mechanical isolation of the lube oil skid before any bearing work. Electrical isolation is performed at MCC-02 with LOTO applied by the area authority.

PRC-0117 Rev F · §4.2 PID-2201 Rev C O&M Manual §7.1

Knowledge collections

Operations Maintenance HSE Engineering Procurement Finance Legal HR Projects

Document register

Doc no.TitleDisciplineRevStatusLinked asset
PID-2201P&ID — CPF Train 02 CompressionProcessCApprovedC-201
PRC-0117Isolation procedure — Gas export compressorsOperationsFApprovedC-201
DTS-4410Datasheet — Thrust bearing BR-550MechanicalBApprovedC-201
INS-8802ILI inspection report — Export PipelineIntegrityAUnder ReviewPL-07
SPC-1190Valve sealing specificationMechanicalDApprovedArea B

Records & transactions

Post a documents transaction — it flows to the linked departments, charts and AI analyst

No records posted yet. Add one and it will appear in the tables above, the Data Studio charts and the AI chat context.

Document register upload

Controlled documents, revisions and review ageing

Drop a CSV export here, or use Upload data

Expected columns: doc_no, title, discipline, rev, status, pages, age_days, review_overdue_days

Files are parsed in your browser — nothing leaves this session.

Chat with this datano data yet

Ask questions about your documents dataset — trends, outliers, cost drivers, next actions.