RM

Maintenance

Work management & reliability execution

Preventive, corrective, predictive, condition-based, emergency and shutdown work against the asset hierarchy.

MTBF

412hrs

MTTR

6.4hrs

PM Compliance

88%

Schedule Adherence

76%

Backlog

1,240hrs

Emergency Work

11%

Maintenance workflow

Standard execution chain

IssueInspectionWork RequestPlanningApprovalWork OrderMaterial ReservationExecutionVerificationClose
CRITICAL Maintenance AgentAI-3391

Bearing degradation predicted on Compressor C-201

C-201 · CPF Train 02

Confidence

87%

ImpactUnplanned shutdown risk ≈ $920K · 36 hrs deferment

Probable causes

  • Vibration 1x/2x harmonics rising over 21 days
  • Lube oil particle count above alarm
  • Load cycling above design envelope

Recommended actions

  • Schedule inspection within 7 days
  • Reserve bearing BR-550
  • Verify lubrication system
  • Combine task with planned shutdown window

Data analysed

  • 180 days of vibration history
  • 43 maintenance records
  • 16 comparable compressors
  • Current operating conditions
Governance: human approval required for safety-critical execution

Asset hierarchy

Site → Plant → Area → System → Equipment → Component

  • SiteZenith Central Complex
  • PlantCentral Processing Facility
  • AreaArea B — Compression
  • SystemTrain 02 Compression System
  • EquipmentC-201 Gas Export Compressor
  • ComponentThrust bearing assembly
  • ComponentLube oil skid
  • ComponentDry gas seal

Maintenance cost

Labor, spare parts and contractor ($K)

Maintenance strategies & schedules

Calendar, runtime, meter, condition and calibration triggers

PlanAssetStrategyTriggerNext dueComplianceStatus
PM-101C-201Condition-basedVibration > 6.5 mm/sin 8 days92%Watch
PM-118C-204RuntimeEvery 4,000 run hoursin 21 days96%On plan
PM-134P-402CalendarEvery 90 daysin 84 days74%At risk
PM-140ESP-W143Meter readingEvery 2,500 motor cyclesin 12 days81%Watch
CAL-22PT-3301CalibrationAnnual — pressure transmitterin 34 days100%On plan

Work order materials

WO-24118 · reserved from warehouse against C-201

SKUItemRequiredReservedIssuedState
SP-BR-550Thrust bearing BR-550210Shortage — PR-5521 raised
SP-SEAL-402Mechanical seal kit442Partially issued
SP-FLT-19Oil filter element111Consumed

Failure codes & root cause

Repeat failures and corrective actions

CodeFailure modeAssetOccurrencesRCA
FC-BRG-01Bearing wearRevise lubrication intervalC-2016Open
FC-SEA-03Mechanical seal leakAPI plan 11 → plan 32P-4023Complete
FC-ELE-07Motor current instabilityVSD tuning + sand checkESP-W1434In progress
FC-COR-02Internal corrosionInhibitor dosage increasePL-072Complete

Technicians, crafts & contractors

Skills, shift and current load

ResourceCraftShiftSkillsLoadWOs
M. SalehRotating EquipmentDay AVibration Cat II, Alignment86%5
R. AdelMechanicalDay ASeals, Pumps62%3
S. NabilInstrumentationNight BCalibration, DCS loops71%4
K. OsmanElectricalDay BHV switchgear, VSD48%2
Contractor — MechServTurnaroundRotationalScaffolding, Welding93%11

Work orders

Open and recently closed

WOAssetTitleTypePriorityCraftDueCostStatus
WO-24118C-201Bearing inspection & vibration surveyPredictiveP1Rotating EquipmentAug 19$18,400In Progress
WO-24102ESP-W143ESP telemetry diagnostic and well testCorrectiveP1ProductionAug 18$9,200Approved
WO-24087P-402Mechanical seal replacementCorrectiveP2MechanicalAug 21$6,400Waiting Material
WO-24070C-204Lube oil sampling & analysisCondition-basedP3ReliabilityAug 24$1,200Planned
WO-24041PL-07Cathodic protection surveyPreventiveP2IntegrityAug 27$15,600Planned
WO-23998S-101PSV recertificationPreventiveP3Static EquipmentAug 12$3,100Completed
WO-23961T-305Roof drain inspectionPreventiveP3Static EquipmentAug 09$800Completed

Turnaround & shutdown

CPF Train 02 — September window

Total jobs

412

Critical jobs

58

Completed

96

Delayed

14

Duration

21days

Budget

$18.4M

Committed $12.1M

Maintenance data upload

Work orders — cost, downtime and craft hours

Drop a CSV export here, or use Upload data

Expected columns: wo_id, asset, type, craft, date, labor_hours, parts_cost, labor_cost, downtime_hours

Files are parsed in your browser — nothing leaves this session.

Chat with this datano file uploaded

Ask questions about your maintenance dataset — trends, outliers, cost drivers, next actions.