Maintenance

Work management & reliability execution

Preventive, corrective, predictive, condition-based, emergency and shutdown work against the asset hierarchy.

MTBF

412hrs

MTTR

6.4hrs

PM Compliance

88%

Schedule Adherence

76%

Backlog

1,240hrs

Emergency Work

11%

Maintenance workflow

Standard execution chain

Issue›Inspection›Work Request›Planning›Approval›Work Order›Material Reservation›Execution›Verification›Close
CRITICAL Maintenance AgentAI-3391

Bearing degradation predicted on Compressor C-201

C-201 · CPF Train 02

Confidence

87%

ImpactUnplanned shutdown risk ≈ $920K · 36 hrs deferment

Probable causes

  • Vibration 1x/2x harmonics rising over 21 days
  • Lube oil particle count above alarm
  • Load cycling above design envelope

Recommended actions

  • Schedule inspection within 7 days
  • Reserve bearing BR-550
  • Verify lubrication system
  • Combine task with planned shutdown window

Data analysed

  • 180 days of vibration history
  • 43 maintenance records
  • 16 comparable compressors
  • Current operating conditions
Governance: human approval required for safety-critical execution

Asset hierarchy

Site → Plant → Area → System → Equipment → Component

  • SiteZenith Central Complex
  • PlantCentral Processing Facility
  • AreaArea B — Compression
  • SystemTrain 02 Compression System
  • EquipmentC-201 Gas Export Compressor
  • ComponentThrust bearing assembly
  • ComponentLube oil skid
  • ComponentDry gas seal

Maintenance cost

Labor, spare parts and contractor ($K)

Maintenance strategies & schedules

Calendar, runtime, meter, condition and calibration triggers

PlanAssetStrategyTriggerNext dueComplianceStatus
PM-101C-201Condition-basedVibration > 6.5 mm/sin 8 days92%Watch
PM-118C-204RuntimeEvery 4,000 run hoursin 21 days96%On plan
PM-134P-402CalendarEvery 90 daysin 84 days74%At risk
PM-140ESP-W143Meter readingEvery 2,500 motor cyclesin 12 days81%Watch
CAL-22PT-3301CalibrationAnnual — pressure transmitterin 34 days100%On plan

Work order materials

WO-24118 · reserved from warehouse against C-201

SKUItemRequiredReservedIssuedState
SP-BR-550Thrust bearing BR-550210Shortage — PR-5521 raised
SP-SEAL-402Mechanical seal kit442Partially issued
SP-FLT-19Oil filter element111Consumed

Failure codes & root cause

Repeat failures and corrective actions

CodeFailure modeAssetOccurrencesRCA
FC-BRG-01Bearing wearRevise lubrication intervalC-2016Open
FC-SEA-03Mechanical seal leakAPI plan 11 → plan 32P-4023Complete
FC-ELE-07Motor current instabilityVSD tuning + sand checkESP-W1434In progress
FC-COR-02Internal corrosionInhibitor dosage increasePL-072Complete

Technicians, crafts & contractors

Skills, shift and current load

ResourceCraftShiftSkillsLoadWOs
M. SalehRotating EquipmentDay AVibration Cat II, Alignment86%5
R. AdelMechanicalDay ASeals, Pumps62%3
S. NabilInstrumentationNight BCalibration, DCS loops71%4
K. OsmanElectricalDay BHV switchgear, VSD48%2
Contractor — MechServTurnaroundRotationalScaffolding, Welding93%11

Work orders

Open and recently closed

WOAssetTitleTypePriorityCraftDueCostStatus
WO-24118C-201Bearing inspection & vibration surveyPredictiveP1Rotating EquipmentAug 19$18,400In Progress
WO-24102ESP-W143ESP telemetry diagnostic and well testCorrectiveP1ProductionAug 18$9,200Approved
WO-24087P-402Mechanical seal replacementCorrectiveP2MechanicalAug 21$6,400Waiting Material
WO-24070C-204Lube oil sampling & analysisCondition-basedP3ReliabilityAug 24$1,200Planned
WO-24041PL-07Cathodic protection surveyPreventiveP2IntegrityAug 27$15,600Planned
WO-23998S-101PSV recertificationPreventiveP3Static EquipmentAug 12$3,100Completed
WO-23961T-305Roof drain inspectionPreventiveP3Static EquipmentAug 09$800Completed

Turnaround & shutdown

CPF Train 02 — September window

Total jobs

412

Critical jobs

58

Completed

96

Delayed

14

Duration

21days

Budget

$18.4M

Committed $12.1M

Records & transactions

Post a maintenance transaction — it flows to the linked departments, charts and AI analyst

Posts toWarehouseFinanceTransaction chain upload

No records posted yet. Add one and it will appear in the tables above, the Data Studio charts and the AI chat context.

Maintenance data upload

Work orders — cost, downtime and craft hours

Drop a CSV export here, or use Upload data

Expected columns: wo_id, asset, type, craft, date, labor_hours, parts_cost, labor_cost, downtime_hours

Files are parsed in your browser — nothing leaves this session.

Chat with this datano data yet

Ask questions about your maintenance dataset — trends, outliers, cost drivers, next actions.